Buying at the excavation stage is the earliest and riskiest stage: the price is often 20–30% below the completed unit, but until the building is commissioned you own not a flat but a claim. Protection: check the construction permit and the developer's land, register the contract in the public registry, tie payments to construction milestones, and plan a realistic 2–3 year horizon.
1. Why it is cheaper at the excavation stage
The developer sells a future flat to finance the most expensive phases: land, design, excavation, the shell. In return it offers the maximum discount to the future price of the completed unit — on the Batumi market often 20–30%, and more on some projects. The further the construction, the smaller the discount: by the end of the shell the price usually approaches market.
On paper this looks like a high return on invested capital: reselling after handover with only 30–40% of the sum invested. But yield is computed across scenarios, not one optimistic case — as in our guide to NOI and IRR.
2. What you are actually buying
Until the building is commissioned, the flat as an object of title does not exist: the contract refers to a future unit in the project. You acquire a claim — the developer's obligation to hand over the object on completion. It is better protected if the contract is registered in the public registry, and weaker if it stays 'in the drawer' with the developer.
Hence the main risk of the stage: if the project stalls or the developer disappears, you become a creditor of the project, not the owner of a flat. Recovering what you paid will depend on the contract, the registration and the company's assets.
3. What to check before the first payment
Due diligence at the excavation stage is broader than on a finished unit: you are not inspecting a flat that does not exist yet, but the project and the company as a whole.
- The construction permit and whether the project matches the filing: floors, areas, parking.
- The developer's right to the plot: a registry extract on the land.
- The company: history, share capital, related projects and their fate.
- The contract: registration of the claim in the registry, payment stages, liability for late delivery, refund terms.
- Who accepts the building and how: technical supervision, the commissioning act.
4. Payment schemes at the excavation stage
The classic is installments tied to milestones: excavation, shell, roof, facade, handover. Every payment should match real progress, not the developer's calendar: paying for a 'shell' that does not exist is a direct way to fund someone else's problems.
Fix in the contract the right to suspend payments if construction stops and the procedure for refunding what is already paid.
5. When entering at the excavation stage makes sense
The early stage suits buyers whose holding horizon is two to three years or more, whose share of capital in the unit is not critical, whose developer has been vetted and whose contract gives real claim protection. It is a bet on a project, not a way to park money quickly.
It does not suit you if you need rental income immediately, if the family's main savings are invested, or if the discount to a neighbouring completed building is out of proportion to the risk.
6. Exiting the deal before handover
The exit is an assignment of the claim to a new buyer. It is almost always possible, but with the developer's consent, re-issuance of obligations and, as a rule, a fee. Liquidity at the excavation stage is lower than for a finished flat: a quick resale usually means a discount to the project's current price list. Factor this into your exit scenario in advance.
What the buyer representative does
GeoTrust at the excavation stage checks permits and land, the company and its past projects, registers the contract in the public registry, ties payments to construction milestones and periodically monitors the build until handover. The fee is reduced by any documented seller commission, so verification often costs the buyer nothing beyond what is already priced in.
Related questions
What discount is normal at the excavation stage?
A guide is 20–30% to the price of a completed unit in a comparable project. A much larger discount is a reason to double-check the developer: it may be compensating for a risk the market can already see.
Can I buy at the excavation stage and sell before handover?
Yes, through an assignment of the claim with the developer's consent. But liquidity is lower than for a finished flat: a quick sale usually means a discount to the project's price list.
What happens to my money if construction is frozen?
It depends on the contract: the refund terms, the registration of the claim and the developer's assets determine whether and how fast you recover what you paid. This is why the contract and the company check matter most before payment.
Do I need to visit the excavation site in person?
No. Document checks and registration are done remotely, and a representative monitors the build with photo and video reports. A personal visit is useful but not required.
Sources and official resources
Legal and tax details are confirmed by a specialised lawyer under the law in force on the transaction date.